Another week of rain and drizzle but the workers have soldiered on through and there is some more progress to the build.

The flooring to the granny flat is down and the frames are up (after we left the roof trusses also went up on the granny flat).






Granny flat bedroom




Granny flat living room with kitchenette




Pieces lying everywhere all marked and ready to be put up - one giant jigsaw puzzle




Roof trusses for our house




Down goes the flooring - after we left they almost completed laying the flooring




A bit of rain over the last week, this hole is almost 1 metre deep




Standing in the Master Bedroom looking out the window - that isn't there yet ;)




Looking down the back driveway at the build site




A couple of more loads of gravel and some drier days required to get any more trucks in and out, workers 4wd's are getting a bit of a workout




The BBQ deck goes here :)




Looking from the back of the house to the front




We have moved the house forward a few metres, resulting in the back not being so high off the ground




Link to the full album
Healesville Build - Frame Work

Saturday, May 21, 2011

Healesville Build - Footings

The rain finally eased a little and the guys got stuck into putting the footings in and starting on the flooring.

It was great to get up there and see plenty of work happening and whilst we were there the walls and roof trusses were being delivered.


















Link to the full album
Healesville Build - Footings

Tuesday, May 17, 2011

Apollo Bay

Another Apollo Bay Great Ocean Road Marathon / Running weekend has come and gone and whilst running isn't my thing it's great to get away kick back and relax with some good food and good wine.

This year saw Rob run the 14km on Saturday and Mak take on the half marathon on Sunday (actually 23km's as the cruel organisers make you run a extra couple so it finishes in the town centre!)

Headed down on Friday (Rob and myself in one car, with Deb, Ann & Seb coming down in the arvo and Ros & Mak coming down that night) with a stop at the Winchelsea Bakery only to be confronted by a small sign stating 'No Pies'. A country bakery with NO PIES! Not a good start to the weekend, upon arrival at Apollo Bay Rob and myself were looking forward to a round of golf but the weather gods had other ides so we were resigned to a coffee in the main drag before getting the keys and heading to our accommodation.

Once we got in we set the fire cranking and settled in for the arvo as the weather kept rolling on in.

Lucky for the runners the weather cleared up a bit on Saturday and Sunday. My duties as support crew - Saturday night steak night and Sunday morning bacon and egg fry up along with maintaining the fire.

A good weekend and Seb as always loves extra people around to play with and entertain.



Sebastian found it quite amusing to wave to us all through the window.


The golf sticks hardly left Seb's side for the entire weekend


The view out the front


The view out the back


Deb and Ann taking Seb for a walk


Smelling the flowers


Cheeky boys


Ocean views


Seb and his shadow


Rob completing his 14km run from Apollo Bay to Paradise and back


Ros and Seb discussing things


Firewatching, real life and on TV


Mak (in the orange cap) completing his half marathon


And manages to crack a smile after finishing


Riding up top






Apollo Bay Great Ocean Road Marathon - Full Album
Apollo Bay - The Great Ocean Road Marathon 2011

Tuesday, May 10, 2011

Healesville Build - The Views

A couple of quick videos of the views before the build begins.

The Front Views
Left living room - Right master bedroom.






The Back Views
Left guest room - Right back deck.

Monday, May 9, 2011

Walking With Dinosaurs

Aunty Ros was kind enough to get us tickets to Walking with Dinosaurs and also offer to babysit for us.

With a cast worth more than $20,000,000 it was a sight to be seen and even a tad educational ;)

Apologies for the quality of the pictures but you may not be aware that flash photography is not something you want to be doing in front of a Dinosaur!













Saturday, May 7, 2011

Healesville Build - Building Begins

Building was scheduled to start on Monday 02nd May but unfortunately some wet weather on Sunday and Monday morning prevented the turning of the soil to begin on Monday. However the guys returned to a drier site on Friday and we got things going, Let the building begin YAY!

Healesville Build - Too Wet To Start
Healesville Build - Too Wet To Start :(


Healesville Build - Building Begins
Healesville Build - Building Begins

Sunday, May 1, 2011

365 Project - The Month of April 2011

365 Project - a photo a day, below is a link to April photos.



Click on the above picture to be redirected to my (anewman13) 365 project month of April - http://365project.org/anewman13/365/2011-04