Sunday, May 29, 2011

Healesville Build - Frame Work Begins

Another week of rain and drizzle but the workers have soldiered on through and there is some more progress to the build.

The flooring to the granny flat is down and the frames are up (after we left the roof trusses also went up on the granny flat).






Granny flat bedroom




Granny flat living room with kitchenette




Pieces lying everywhere all marked and ready to be put up - one giant jigsaw puzzle




Roof trusses for our house




Down goes the flooring - after we left they almost completed laying the flooring




A bit of rain over the last week, this hole is almost 1 metre deep




Standing in the Master Bedroom looking out the window - that isn't there yet ;)




Looking down the back driveway at the build site




A couple of more loads of gravel and some drier days required to get any more trucks in and out, workers 4wd's are getting a bit of a workout




The BBQ deck goes here :)




Looking from the back of the house to the front




We have moved the house forward a few metres, resulting in the back not being so high off the ground




Link to the full album
Healesville Build - Frame Work