Healesville Build - A Video Walk Through

Here is a little video walk-through of the build, this video was taken before my last post, thus before painting begun, all the plaster board is hung though so you get a good sense of room size now.


Sunday, July 24, 2011

Healesville Build - Painting Begins, Deliveries

Wow, how a bit of paint can change the look of a place, on Wednesday plasterers were busy hanging and still had plenty of work ahead of them.
Saturday we have cornicing complete, all plaster work done and painting begun, granted it's spray on base coat but still changes they look and feel of the whole place.

Along with the start of painting we have plenty of deliveries come in, the kitchen has been delivered, tiles, doors, hot water systems and various other bits and pieces.


Outside painted, and some downpipes installed (let it rain - not too much though!)


Outside painted


Adult living painted


Master bedroom, partly painted


Outside partly painted


Some inside paint work


Kitchen delivered and ceiling painted


Doors delivered


Tile delivery


Feature tile for the kitchen


Feature tile for the Granny Flat


Some paintwork in the Granny Flat


Granny Flat bedroom


You can check out the full album below
Healesville Build - Painting, Tiles Delivered

Thursday, July 21, 2011

Healesville Build - Power Connected, Handrails, Plastering

The build continues to motor along with handrailing and decking happening on the outside and plasterboard going up inside.

Power is connected


Septic tank take 2


Front Porch Handrail


The back deck has turned into the workshop


More handrails going up


The plaster guys have been busy the last few days hanging plaster and as of yesterday (Wednesday 20th July) they had all the ceiling up and walls hung, just the finishing and cornicing to go which should be finished by this Saturday.


The front door


Adult living


Master bedroom


Study / Bedroom 4


Family / Meals


Back deck


Dining


Kitchen


Seb's Room


Hallway linking Seb's room, Bathroom, Laundry, Guest Room


Guest Room


You can check out the full album of plastering below
Plastering

Tuesday, July 12, 2011

May Happenings

The blog has been well and truly dominated by the building of the house of late so I thought it was time to get a few snaps up of the daily happenings and some more Seb pics.

Will start with some stuff from May, not a great deal of shots from May, very unlike me not to have my camera in use!


Seb and some whackers or walking sticks


Video of Seb and his sticks


Seb starting to become very attached to his Buzzy Bee, a gift from Niki in NZ.


And a video of Seb and his Buzzy Bee


Mr Fire Engine


Farley guarding the very expensive cubbie house


Seb enjoying a chocolate biscuit at Nanna's


Adam supplying some props for Mak - ok you probably had to be there but I still find it funny so it's going on the blog ;)



May was also a pretty lean month for my 365Project - a photo a day, you can check out the month of May here.

Saturday, July 9, 2011

Healesville Build - Handrail, Aircon, Ramp

This week saw the carpenters work on the ramp to the granny flat, start installing the hand rails around the front porch, back deck and linking ramp. Inside plastering hasn't begun just yet but the aircon guys have been busy installing the unit and ducting whilst more deliveries of plasterboard, cornicing and various other bits and pieces have arrived on site.

Front of the house


Aircon return air


Back deck with handrail started


Hand rail, nice and wide to hold the drinks


Back deck, with some temporary stairs


Back deck


Back of the house & granny flat


Granny flat ramp




Link to the full album below
Healesville Build - Hand Rail, Lily's Ramp

Monday, July 4, 2011

Healesville Build - Cladding, Kickers, Septic, Water Tank

The House is really starting to take shape as the kickers are on, septic installed, rain water tank installed (with a few down pipes, more to go) and plenty of insulation and plasterboard delivered ready for this weeks work.






Weatherboard and kickers all on the Master bedroom


Septic Installed


Water tank


A kitchen full of plasterboard


Deb's Bath


Laundry door is on - we are at lock up! :)


Back sliding doors (the last to go in)


A deck full of insulation


Links to the two albums below
Healesville Build - Kickers Outside


Healesville Build - Septic, Water Tank, Bath Installed