Saturday we have cornicing complete, all plaster work done and painting begun, granted it's spray on base coat but still changes they look and feel of the whole place.
Along with the start of painting we have plenty of deliveries come in, the kitchen has been delivered, tiles, doors, hot water systems and various other bits and pieces.
Outside painted, and some downpipes installed (let it rain - not too much though!)
Outside painted
Adult living painted
Master bedroom, partly painted
Outside partly painted
Some inside paint work
Kitchen delivered and ceiling painted
Doors delivered
Tile delivery
Feature tile for the kitchen
Feature tile for the Granny Flat
Some paintwork in the Granny Flat
Granny Flat bedroom
You can check out the full album below