Plenty of action up at the house with floors going down, Coonara's being installed and the plumber finishing off the fittings, installing toilets. With only a week to go there is not much left to do besides the touch up's here and there and the power switch over.
Coonara #1 in the front living room
Carpet has been laid
Ensuite
Ensuite
Family / Meals
Family / Meals
Coonara #2
Bathroom
Bathroom
Laundry
Solar Hot Water System
Solar Hot Water System (Evacuated Tubes)
The guys busy drilling 440 holes in preparation for 900 metres of stainless steal cable to be run.
You can view the full album below
Healesville Build - Floors Laid, Coonara Installed, Plumbing Fixtures - One week to go! |
No comments:
Post a Comment