Wednesday, August 24, 2011

Healesville Build - Floors Laid, Coonara Installed, Plumbing Fixtures - One week to go!



Plenty of action up at the house with floors going down, Coonara's being installed and the plumber finishing off the fittings, installing toilets. With only a week to go there is not much left to do besides the touch up's here and there and the power switch over.





Coonara #1 in the front living room


Carpet has been laid


Ensuite


Ensuite


Family / Meals


Family / Meals


Coonara #2


Bathroom


Bathroom


Laundry


Solar Hot Water System


Solar Hot Water System (Evacuated Tubes)


The guys busy drilling 440 holes in preparation for 900 metres of stainless steal cable to be run.




You can view the full album below
Healesville Build - Floors Laid, Coonara Installed, Plumbing Fixtures - One week to go!

Friday, August 19, 2011

Seb TV

Time for another installment of Seb TV.


Who let the dogs out?


Trying on dad's shoes for size?


Sliding doors are fun

Monday, August 15, 2011

Healesville Build - Video Walk Through - Painted, Tiled, Kitchen Installed

Here is a second video walk through, showing most of the internal painting done, tiling done and kitchen installed.

Sunday, August 14, 2011

July Pics

Seb and Harper playing, Seb looks massive compared to Harper (they are roughly the same age)


Seb's version of the chicken dance?


Happy 60th Ann - a new dog, Ms Ricki


Triple Yolker - now that's exciting!


Bubble Bath!


Ahh the serenity


Seb crusing the streets


Chilling in the big chair


Seb trying on daddy's shoes


Cool dude


Vroom go the racing cars


Having fun on the swing


When do I get a drive?

Friday, August 12, 2011

Seb TV - A Video Update

Time for some Seb TV, hope you enjoy the videos


From the March holiday to Wollongong - Ann & Seb on the slide


Another Wollongong clip - who is having more fun on the swing?


Ann, Seb & Adam try the spinner out


Seb playing and showing us the horses on the TV


Seb gets creative in the car with Mr Bucket


From March at Canberra, Seb shows his clever walking skills


Seb goes BOOM


Sebastian sussing out the iPhone


Seb's got it sussed and is in full conversation

Thursday, August 11, 2011

Healesville Build - Photo Updates

The build has been progressing extremely well and the finish line is in sight!

Find below a link to plenty of photos in various albums from the last couple of weeks.


Healesville Build - Painting, Kitchen, Fixing Stage (29th July 2011)
Healesville Build - Painting, Kitchen, Fixing Stage


Healesville Build - Painting, Tiling Begins (01st August 2011)
Healesville Build - Painting, Tiling Begins


Healesville Build - Tiling Nearly Complete, Ramp Done (05th August 2011)
Healesville Build - Tiling Nearly Complete, Ramp Done


Healesville Build - Tiling Finished (08th August 2011)
Healesville Build - Tiling Finished

Saturday, July 30, 2011

Seb TV



Seb enjoying some car racing action at Sandown




The plastic tub game




Happy 60th Gran & Grandad, or is that happy 120th?!
Seb loved the balloons



Wednesday, July 27, 2011

Healesville Build - A Video Walk Through

Here is a little video walk-through of the build, this video was taken before my last post, thus before painting begun, all the plaster board is hung though so you get a good sense of room size now.


Sunday, July 24, 2011

Healesville Build - Painting Begins, Deliveries

Wow, how a bit of paint can change the look of a place, on Wednesday plasterers were busy hanging and still had plenty of work ahead of them.
Saturday we have cornicing complete, all plaster work done and painting begun, granted it's spray on base coat but still changes they look and feel of the whole place.

Along with the start of painting we have plenty of deliveries come in, the kitchen has been delivered, tiles, doors, hot water systems and various other bits and pieces.


Outside painted, and some downpipes installed (let it rain - not too much though!)


Outside painted


Adult living painted


Master bedroom, partly painted


Outside partly painted


Some inside paint work


Kitchen delivered and ceiling painted


Doors delivered


Tile delivery


Feature tile for the kitchen


Feature tile for the Granny Flat


Some paintwork in the Granny Flat


Granny Flat bedroom


You can check out the full album below
Healesville Build - Painting, Tiles Delivered

Thursday, July 21, 2011

Healesville Build - Power Connected, Handrails, Plastering

The build continues to motor along with handrailing and decking happening on the outside and plasterboard going up inside.

Power is connected


Septic tank take 2


Front Porch Handrail


The back deck has turned into the workshop


More handrails going up


The plaster guys have been busy the last few days hanging plaster and as of yesterday (Wednesday 20th July) they had all the ceiling up and walls hung, just the finishing and cornicing to go which should be finished by this Saturday.


The front door


Adult living


Master bedroom


Study / Bedroom 4


Family / Meals


Back deck


Dining


Kitchen


Seb's Room


Hallway linking Seb's room, Bathroom, Laundry, Guest Room


Guest Room


You can check out the full album of plastering below
Plastering